Double EX Socket Tee with Flanged Branch
Delivery term:The date of payment from buyers deliver within days-
Price:
Negotiable
- minimum:
- Total supply:
-
Delivery term:
The date of payment from buyers deliver within days
-
seat:
Beijing
-
Validity to:
Long-term effective
-
Last update:
2017-07-11 19:38
-
Browse the number:
188
+
Qingdao Nancy Metal & Machinery Co. Ltd
- Contactaixin:
Contactaixin:
nancymetal(Ms.)
- telephone:
-
Area:
Beijing
Address:No. 138 Dunhua Road, 1303, Eurasian Center,Shibeiqu,Dingdao,, Shandong,China, Qingdao, Shandong, China (266034)
- Website:
+
Model Number: NMM-XX-028
Brand Name: NMM or OEM
Key Specifications/Special Features:
Double EX socket tee with flanged branchMaterial:1)Body/gland/hooked bolts and nuts:Ductile iron grade 500-7/ 450-12 in accordance with ISO10832)Gasket:Rubber E.P.D.M. in accordance with EN 681.1Technical data:
1)Working pressure: 16Bar or 250Psi
2)Fluid temperature: 0°C-50°C, excluding frost
3)Dimensions and testing in accordance with ISO 2531/EN 545
Surface treatment:
External coatings:
1)Zinc coating +bitumen painting
2)Liquid epoxy painting
3)Epoxy applied by FBE
4)According to customers' requirements
Internal coatings:
1) Cement mortar lining 2)Liquid epoxy painting
3) Epoxy applied by FBE
4) According to customers' requirements
Note
The EX joint on this kind of fittings can prevent separation of the assembled joint and permits more larger angular deflection both during and after installation and which can accept a light offset of the centerline
1)Working pressure: 16Bar or 250Psi
2)Fluid temperature: 0°C-50°C, excluding frost
3)Dimensions and testing in accordance with ISO 2531/EN 545
Surface treatment:
External coatings:
1)Zinc coating +bitumen painting
2)Liquid epoxy painting
3)Epoxy applied by FBE
4)According to customers' requirements
Internal coatings:
1) Cement mortar lining 2)Liquid epoxy painting
3) Epoxy applied by FBE
4) According to customers' requirements
Note
The EX joint on this kind of fittings can prevent separation of the assembled joint and permits more larger angular deflection both during and after installation and which can accept a light offset of the centerline
Shipping Information:
- FOB Port: China (Mainland)
- Lead Time: 10 - 60 days
Main Export Markets:
- Asia
- Australasia
- Mid East/Africa
- Western Europe